General Info | : | 2150 m DN1200 (12 mm) Black Steel Pipes are wanted to be displaced by the Ministry. Pipe joining with certified welders, excavation, filling, sand supplying, sand routing, compression, security measures against collapse, the issuance of topographic services, moving the materials to the site, design, supply and construction works have been completed under obligation of Waterfall Engineering |
Location | : | Ashgabat |
Description | : | Airport Water Displacement Line |
Client | : | Polimeks A.S. |
Construction Area | : | – |
Contract Date | : | 06.07.2015 |
Contract Period | : | 4 months |
Delivery Date | : | 01.11.2015 |